1998-2008
  • External areas renovation of the Chamber of Commerce Expo Centre of Ascoli Piceno
  • Specific and electrical system revamping of the Town Hall of Maltignano (AP)
  • Specific and electrical system of the facility for stuffed olives production in Ascoli Piceno
  • Street lighting of Via E.Che Guevara (main street) in the district of Maltignano (AP)
  • Electrical revamping of greenhouses for flower plantation- “Società Az.Agricola La Collina in Fiore”.
  • Project “Security” (safety system design) Ascoli Piceno
  • Upgrading project for post offices of Lanciano (CH), San Pio (AQ), Bologna succ.6, Ponza (LT)
  • New warehouse executive design of an animal shop of 1600m²
  • Fish processing facility project in Martinsicuro
  • Street lighting “Via della Stazione” in Maltignano (AP)
  • Electrical adaptation according to DK 5600 Enel directive of Carisap sites of Ascoli Piceno, Macerata and San Benedetto del Tronto.
  • Electrical adaptation according to DK 5600 Enel directive of Town Hall of Ascoli Piceno
  • Industrial project for plastics processing facility and workshop –Offida (AP)
  • Parking area project ( 3 underground levels) – Ascoli Piceno
  • Parking area project ( 2 levels, of which 1 underground) – Ascoli Piceno
  • Design of a new system for dust reduction of a pharmaceutical facility – AP
  • New electrical installation for pharmaceutical warehouse facility – AP
  • New electrical installation of compression area for pharmaceutical facility – AP
  • New electrical installation of manufacturing area for pharmaceutical facility – AP
  • New area “SOFTGEL CAPSULES DEPARTMENT” – pharmaceutical facility – AP
  • New preparation area for pharmaceutical facility – NA
  • New manufacturing area for pharmaceutical facility – NA
  • Revamping of Sterile Manufacturing Facility – Anagni
2010
  • Roof/floor photovoltaic systems of commercial buildings and offices – total P=4 MW
  • Facility enlarging with MV upgrade of stuffed olives manufacturing site – Ascoli Piceno
  • Dental clinic 250m² – AP
2012
  • Revamping of a lift station – 6 pumps of 132 kW, primary distribution, automation panel board and operating logic -Capodacqua district of Arquata del Tronto (AP)
  • Revamping of a dry dock – installation power 8 MVA
  • Photovoltaic roofing and floor systems for commercial buildings – total P=100kW
  • SCADA platform design (CFR21) HVAC system of a pharmaceutical facility – NA
  • Upgrading design of regulation and supervision unit of bottling department – pharmaceutical facility NA
  • Upgrading of existing HVAC machines
2014
  • Auxiliary facility substation executive design (control and electrical room) no. 6 Diesel generators 1MVA each – Kurdistan IRAQ
  • Auxiliary facility substation executive design GAS SUPPLY COMPRESSOR ZUBAIR Mishrif degassing station “LER”
  • Auxiliary facility substation executive design (switch gear room) no. 6 Diesel generators 1,6 MVA each – IRAQ
  • Revamping of transformer room of a water treatment facility – Maltignano (AP)
  • Municipal swimming pool electrical system restoration – Ascoli Piceno
  • CED room executive design – pharmaceutical facility – NA
  • Air inlet system for a production line (HVAC) in a pharmaceutical facility – PR
2016
  • Transformer room (630kVA) in a plastics processing facility – Offida (AP)
  • Control room system executive design – Libya
  • Control room system executive design – Maleysia
  • Technical documentation necessary to adapt photovoltaic systems to AEEG 595/2014/R/EEL and 421/2014/R/EEL
  • New warehouse for FARMINA animals products – Ascoli Piceno
  • Revamping of sterile preparation area ELECTRICAL, HVAC, PIPING, CIVIL – pharmaceutical facility (LU)
2018
  • Project for new blister production line in a pharmaceutical facility – Ancona
  • New turboemulsifier design for pharmaceutical facility – Ancona
  • Progress warehouse for animals products – 1° floor of 600m2 – Ascoli Piceno
  • Trigeneration installations – no.2 x 2,6MW for pharmaceutical facility – Siena
  • Release of DIRI n. 3 lot (San Benedetto del Tronto) for lifting installations/ purification and products    in progress
  • Enlargement of a warehouse for FARMINA animal products storage phase II – Ascoli Piceno    in progress
  • Lighting of external west parking lot of an industrial plant – Ascoli Piceno
  • Lighting safety system of pharmaceutical plant – Ascoli Piceno
  • Auxiliary installation LER, “ORKEN CAMP” project – Iraq
  • Entrance enlargement of a medical centre RSA – Ascoli Piceno
  • Renovation and seismic adaptation of an indistrial plant – Montorio al Vomano (TE)
  • Electrical installations of olive production and wine bottling plant in Villa Sant’Antonio (AP)
  • Electrical and heating system for a new sales store -OVS -Terracina (LT)
  • Production activity relocation, design of electrical and meccanical systems of a pork production plant – Accumoli (RI)
  • Upgrading of an emergency department of S. Spirito hospital in Sassia – Rome
  • Upgrading of an electrical system and regulatory adaptation in “Officina ONAV”– Ancona
  • New dock n. 2 of shipyard careening in Ancona
2009
  • Project for the construction of a new facility for processing marble and travertine – Pagliare del Tronto (AP)
  • Executive design of painting and sandblasting technical department – Ancona
  • Integrated photovoltaic system P = 11kW. Preliminary, final and executive design – Ascoli Piceno
  • Emergency diesel generator transformation box – health centre Ascoli Piceno
  • Transformer rooms adaptation to DK5600 Enel standards – Ascoli Piceno
  • Automation system for Expo Centre of the Chamber of Commerce of Ascoli Piceno
2011
  • Photovoltaic floor system and power line – SUNGRID Ltd P=200kW
  • Photovoltaic floor system– VIRGILIO 1929   P=710kW
  • Health Centre installations – Comunanza (AP)
  • Design of a 1250kVA Diesel generator – pharmaceutical facility – NA
2013
  • MV/LV transformer box revamping project of a water treatment facility Lido di Fermo
  • 250kVA Diesel generator – water treatment facility Lido di Fermo
  • Photovoltaic roofing system P = 69kW Private Company – AP imp. Travaglini
  • MV/LV box revamping project, well lifting – Capodacqua
  • New 6MVA dockside executive design
  • Executive design for 80-bed healthcare structure– Ascoli Piceno
  • Upgrading executive design of a regulation and supervision unit in a Plasma department of a pharmaceutical facility – NA
  • Upgrading executive design of a regulation and supervision unit in a Filling department of a pharmaceutical facility – NA
2015
  • Transformer room upgrading project for pork processing facility – Accumoli (RI)
  • Installations verification of requirements for DIRI release – special waste disposal facility Maltignano (AP)
  • System executive design for connecting an electrical substation (switchgear room) with a 1,6MVA diesel generator –IRAQ
  • Upgrading project for Electrical, HVAC and PIPING laboratory of a pharmaceutical facility – NA
2017
  • Executive design of auxiliary facility electric substation (switch gear room) – Tunisia
  • Water lifting station 500kW – facility in Ancona
  • Executive design of a new washing area in pharmaceutical facility – Ancona
  • Electric substation (no. 4) and FAR control rooms (no. 6) – IRAQ
  • Pharmaceutical research laboratory design – NIL – Ascoli Piceno
  • 3,2 MVA MV/LV transformer room upgrading in a plastics processing facility – Ancarano (TE)
2019
  • Auxiliary installations UPS room “ORKEN CAMP” project – Iraq  in progress
  • Electrical installations of technical spaces for “BONATTI PERTAMINA” project  in progress
  • Development of transformer box (n. 2) MT/BT 3,2MVA for plastics processing plant – Ancarano (TE)  in progress